first commit

7 jobs for main in 0 seconds (queued for 69 minutes and 57 seconds)
Status Name Job ID Coverage
  Build
failed build #3710

 
  Test
failed code_quality #3712
allowed to fail

skipped eslint-sast #3713
allowed to fail
skipped phpcs-security-audit-sast #3714
allowed to fail
skipped secret_detection #3716
allowed to fail
skipped semgrep-sast #3715
allowed to fail
failed test #3711

 
Name Stage Failure
failed
build Build There has been a timeout failure or the job got stuck. Check your timeout limits or try again
No job log
failed
test Test There has been a timeout failure or the job got stuck. Check your timeout limits or try again
No job log
failed
code_quality Test There has been a timeout failure or the job got stuck. Check your timeout limits or try again
No job log

Speed up your pipelines with Needs relationships

Using the needs keyword makes jobs run before their stage is reached. Jobs run as soon as their needs relationships are met, which speeds up your pipelines.

If you add needs to jobs in your pipeline you'll be able to view the needs relationships between jobs in this tab as a Directed Acyclic Graph (DAG).